Pay in 4 interest-free payments of $3.50 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 29 - Sep 3
Pay in 4 interest-free payments of $3.50 Learn more
Ships within 48 hours · Estimated delivery Aug 29 - Sep 3
Click here for spec sheet: SUCSP Spec Sheet
and is adjustable to a lower setting
Flex-bonded cords are strongly secured to the belt's body for equal load distribution and absorption of bending stress without cord deterioration
2-PIECE SYSTEM THAT VIRTUALLY ELIMINATES LIPPAGE ON FLOORS AND ON WALLS DURING TILE INSTALLATION
Click here for spec sheet: SNATP Spec Sheet
ECF12 2-Piece Metal To Metal Imported Spherical Rod End Bearing 8mm Wide Click here for spec sheet:CLICK HERE FOR CATALOG PAGE 2 PIECE CONSTRUCTION IMPORT ECONOMY SERIES PTFE LINER NOT AVAILABLE STUDS AVAILABLE OPTIONAL LUBRICATION FITTING AVAILABLE MALE ROD END LOAD RATING BASED ON NO LUBRICATION FITTING FOR LOAD RATING WITH LUBRICATOR PLEASE CONTACT FK ENGINEERING BALL 52100 STEEL Rc 56 MIN HARD CHROME PLATED BODY LOW CARBON STEEL ZINC PLATED CHROMATE TREATED
US$ 29.36
US$ 15.07
US$ 11.88
US$ 17.47
US$ 12.47
US$ 18.88
US$ 14.40
US$ 12.57
US$ 22.88
US$ 18.08
US$ 14.59
US$ 16.76
US$ 15.07
US$ 17.81
US$ 20.89
US$ 23.44
US$ 28.64
US$ 12.08